Image 1

Image 1

Active area of landfill - filling of final cell - all site machines contained in one photo i.e. compactor, dozer, digger, haul truck‌

Image 2

Image 2

final capping - note impermeable plastic liner in black, with overliner drainage layer in white - 850mm subsoil over, with 150mm topsoil at top (topsoil not shown)

Image 3

Image 3

Suction supply pipes to temporary gas extraction well (blue); temporary liner on cell shown, leachate extraction sump in left background with gas extraction pipe coming from top.